Featured Project: Summit On College – Construction begins April 2015

Exterior

Picture 1 of 5

This design-build project consists of a 4 story 435 stall precast parking structure. The project is located in downtown Fort Collins and will be utilized primarily for student housing.

The most difficult challenge of this project is schedule. With the goal of building this structure during the summer while students are away at summer break doesn’t allow for much time for building a structure of this size. With the help of our strategic partner, Rocky Mountain Prestress, we have a progressive plan in place to meet this challenge head on.